|
DML has the only comprehensive engineering facility in the Westcountry
which is linked to the national rail network.
DML has been overhauling IC125 power units on a running contract
basis since 1988. Both diesel engine and generator are overhauled
in-house and then reassembled for a combined running test before
delivery. Sulzer and Ruston locomotive power units have also been
overhauled.
A range of associated sub-assemblies is overhauled on a regular
basis, such as turbo-blowers, fuel injector systems, generator
units, starter motors and other items of electrical equipment.
DML can also handle an immense range of valves and pumps, hydraulic
systems, piping and wiring upgrades, catering galley equipment,
air conditioning plant, switch-gear, electronic and radio equipment.
DML has moved into bogie overhaul and is now working on IC 125
power and trailer bogie overhauls. The bogies are stripped and
the frame is checked and repaired as necessary. All components
are overhauled, either in-house or by contractors and the traction
motors are overhauled in our own workshops. On reassembly, each
bogie is checked against the original specification and given
functionality tests before delivery.
DML has a highly-regarded Composites Group which specialises
in innovative applications of advanced composite materials, such
as strengthening tunnel roof structures for London Underground.
DML's composite materials expertise is also used in the repair
of GRP nose mouldings from IC125 power cars.
|